ITERATION PLAYBOOK
For a startup bridging 200 pieces, compare CNC, SLA, SLS, MJF, a 3D-printed tool and an aluminum tool against the same drawing before you accept a substitute. This page is a purchase-decision checklist, not an ESG statement, carbon claim, or net-zero story.
These labels are buyer reminders, not badges this desk holds.
CNC advocates cite production-grade materials and true mechanical properties. Additive-part advocates cite 24–48 hour loops and geometry that milling cannot reach. Those routes do not replace a 200-piece molded lot. If you accept MJF in place of molded ABS, write which tests are waived. If you accept CNC in place of a first tool, write which gate and knit-line risks remain untested.
Printed-tool advocates cite lower NRE and a faster first cavity while revision C is still moving. Aluminum-tool advocates cite a stabler shrink map, SPI texture, and a shot-life that more often covers 200 pieces in one cavity. Accepting either route as “good enough for launch” without a shot-count limit written on the quote is how a bridge insert becomes an unplanned reprint or an unplanned steel PO.
| Route | Typical buyer check | Limitation to disclose |
|---|---|---|
| SLA | Cosmetic envelope, clip fit | UV aging and production resin mismatch |
| SLS / MJF | Living hinge screening, ducts | Surface roughness versus SPI texture |
| CNC | Snap fit in production polymer | No gate, no knit line, no mold shrink map |
| Printed tool | Fast first cavity, ECO-friendly insert | Shot-count often below 200 unless written |
| Aluminum tool | T1 molded parts, gate vestige | Shot-life and steel-upgrade trigger |
Inspection method stays explicit: optical scan, CMM, or caliper-only. Build volume and layer resolution matter for additive parts; shot weight, clamp tonnage and the shot-count limit matter once a press is in the packet. None of those numbers are guaranteed by this desk.
State which process is required, whether an aluminum tool or a printed tool is allowed, quantity, destination and the first inspection pack. Optional budget and preference merge at submit time.
Eligible sourcing support may be available up to 3% after requirement review.
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
This is not a fixed discount. On a 200-piece bridge lot the factory still has to write the shot-count cap on the quote.
Submit procurement requirements