Medical housings
Ask ISO 13485 scope, resin biocompatibility notes, lot traceability, and whether a printed tool is barred for the 200-piece functional lot.
APPLICATION INDEX
Translate a project use into a 200-piece purchase packet: documents, delivery stages, site constraints, and whether a printed tool is even allowed before steel. This page does not assign a factory to your program.
What is the intended project use? State whether the 200 pieces are T1 functional, field trial, or already shippable. Name FAI, CMM, CoC, PPAP or material certificate as included or excluded. Skipping T1 on a printed insert often hides gate and warp issues until the cavity has already spent most of its shot budget.
Site constraints belong here: US receiving dock, humidity-sensitive resin, and whether the destination can accept ocean crates or needs air for first articles. Incoterm must sit next to the destination ZIP so freight is not an afterthought on a 200-piece crate.
Printed-tool advocates accept a second insert if revision C moves before piece 200. Aluminum-tool advocates want one cavity through the lot and a closer SPI / gate analog. Tight-tolerance advocates still argue sealing faces need ±0.05 mm; cost-discipline advocates open non-functional ribs toward ±0.2 mm. Record which features are critical instead of tightening the whole drawing.
Offshore advocates cite unit cost once EAU grows. Domestic advocates cite shorter T1 loops while the startup is still changing gates. Keep both arguments as RFQ notes. Do not convert either side into a published savings percentage for this site.
| Selection factor | What to write on the RFQ | What stays unconfirmed |
|---|---|---|
| First tool | Printed insert or aluminum, plus the shot-count limit | Actual tool life until production evidence |
| Resin | Grade, fill, color, regrind rule, melt temperature vs printed-tool limit | Lot availability at award |
| Inspection | FAI / CMM / PPAP level on the 200-piece lot | Cpk until capability study |
| Landed cost | Currency, Incoterm, destination, second-insert reprint | Duty and freight until written |
This site does not host a file locker. After the form, send drawings on the channel we confirm. Do not paste export-controlled files into a first note if counsel has not cleared that path.
A low volume injection molding supplier can only quote what you freeze. Submit specifications, the 200-piece count, destination, timing, and whether aluminum or a printed tool is allowed. Optional budget and preference merge at submit time.
Eligible sourcing support may be available up to 3% after requirement review.
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
This is not a fixed discount. On a 200-piece bridge lot the factory still has to write the shot-count cap on the quote.
Submit procurement requirements